Loading

Shopping cart

INR
EVM

EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) (EVM-WDKM-315)

Description EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) EVM EnHawk 7B23 Wired Keyboard & Mouse Combo is perfect for gamers seeking high-performance features like multi-color LED modes, 19-key anti-ghosting with a 6 button mouse that has adjustable 3600DPI settings for precise control. Features: 104 Keys Gaming Keyboard Size: 430.7*131*30 mm, N.W.: 439g PU Cable: 1.5 meters, Factory standard USB Key: 104 keys Multi media FN Function: FN+F1-F12 Backlight: multi-color LED modes, can be switch 19 keys anti-ghosting Color: Silk print keycaps, Injection White and blue E key Gaming mouse 6 Buttons, DPI 1200-1800-2400-3600; Size:126*66*39mm Pu cable length:1.5meter Factory standard USB, Silk print grey logo, and text Specification: Model EnHawk 7B23 Wired Keyboard & Mouse Combo SKU EVM-WDKM-315 Keyboard Key 104 Backlit Lighting Multicolor LED Interface USB Mouse Button 6 DPI 3600 Color White Warranty 1 Year Note *** Features, Price, Specifications are subject to change without notice.
₹1,223.00 ₹1,390.00
Available

Quantity

SKU: EVM-WDKM-315
Category: Keyboards
Share:
  • 30 days easy returns
  • Order yours before 2.30pm for same day dispatch

Guaranteed safe & secure checkout

Guaranteed safe & secure checkout
EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) (EVM-WDKM-315)

EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) (EVM-WDKM-315)

₹1,223.00 ₹1,390.00