Loading

Shopping cart

INR
EVM

EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) (WDKM-612-SILVER-WHITE)

Description EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) EVM EnClaw 9027 Wired Keyboard & Mouse Combo is perfect for gamers seeking high-performance features like RGB backlighting, 19-key anti-ghosting with a 6 button mouse that has adjustable 7200DPI settings for precise control. Features: Gaming keyboard 104 Keys,Silver Metal Plate Cable :1.5 m Braided cable Gold plated USB Multi media FN Function: FN+F1-F12 Backlight: RGB multil color led modes,can be switched Silk print key caps with Injection blue E key , PVC gasket for metal holes 19 keys anti-ghosting Gaming mouse Buttons:6 Cable length:1.5m braided cable ,Gold plated USB Rainbow luminous, rubber oil coated, radium carving LOGO and Text DPI: 1200-2400-4800-7200(with Macro function) Specification: Model EnClaw 9027 Wired Keyboard & Mouse Combo SKU EVM-WDKM-612 Keyboard Key 104 Backlit Lighting Multicolor RGB Interface USB Mouse Button 6 DPI 7200 Color White Warranty 1 Year Note *** Features, Price, Specifications are subject to change without notice.
₹1,271.00 ₹1,550.00
Available

Quantity

SKU: WDKM-612-SILVER-WHITE
Category: Keyboards
Share:
  • 30 days easy returns
  • Order yours before 2.30pm for same day dispatch

Guaranteed safe & secure checkout

Guaranteed safe & secure checkout
EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) (WDKM-612-SILVER-WHITE)

EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) (WDKM-612-SILVER-WHITE)

₹1,271.00 ₹1,550.00